The concrete block facility is undergoing a comprehensive renovation program with an estimated completion date of June 2026. Improvements include a new TPO roof, upgraded site conditions, and a functional industrial layout featuring 20-foot clear height and 208/120V three-phase electrical service. The building includes an ADA-compliant restroom and two oversized grade-level doors that support drive-through circulation and operational efficiency.
The site encompasses approximately 2.94 gross acres, including usable yard areas designed to accommodate outdoor storage, equipment staging, fleet parking, and industrial support functions. Asphalt drive lanes and parking areas are complemented by gravel yard space at both the front and rear of the property. Fully fenced perimeter security with gated keypad access enhances controlled site operations while city water, sewer, natural gas, and electric utilities support a wide range of industrial users.