• Canal Road has been graded, partially graveled and partially paved
• Traffic study completed and WYDOT has approved access onto US 89. The approved access calls for one single access onto Highway 89, equating to a reduced expense for the developer.
• Previously approved master plan can be used, or owner can make application for new plan.
• Power nearby (already installed in the residential sold-out area and townhouse area)
• Freedom Water - Water supply system evaluation has been completed and is available for review. Water in the alluvial aquifer was found to be “ excellent, meeting all EPA Drinking Water standards with a substantial margin.“