Lot 1 Final Platting is included. The Geotech Report for a Lot 1 Foundation and Pavement Recommendations is included. Lot 1 is entitled to utilize all three driveway/curb cuts feeding onto Reimers Peacock (four lanes) which is currently under construction and has a cross access easements between all three curb cuts will be provided. Design Survey for Tree, Topo and Title is included. A Clean Environmental Resource Inventory per Travis County specifications is included. Water Quality and Detention Pond for up to 45% impervious cover is included, including design, permitting and construction (saving the buyer months of time for all three of these tasks). This includes Master Planned grading for Lot 1 improvements to flow into the pond unimpeded. Master Planned PEC Electric infrastructure up to Lot 1 transformer pad is included. Master Planned Telecom infrastructure along the Reimers Peacock road is underway.