Subdivision approval for the site is expected by Q3 2025. Lot layouts range from approximately 4 to 6 acres and can be combined or configured to accommodate larger-scale users. Grading of the lots was completed in May 2025, and they are available for immediate construction through temporary access routes.
Construction of roads, water, sanitary services, and utilities is scheduled to be completed by Q4 2025, aligning with timelines for final occupancy. The lots are being offered at $550,000 per acre and will be stripped and graded to the vendor’s base specifications, with a site slope of 1% to 3%. Water and wastewater services will be accessible for connection at the road along the property line, while shallow utilities—including electricity, gas, and fiber—will be available within the designated utility right-of-way.
.