215+ Acres
Ready for development
Accelerated permitting (rapid start)
Strategic location
Competitive pricing
Tax incentives
Zoned Light Industrial
Newly completed infrastructure includes Mickelsen Parkway access, a new power substation, fully connected utilities, and high-speed broadband, ensuring the site is ready for seamless development and connectivity
Flexible design available for uses such as advanced manufacturing, green energy, data center, semiconductor, distribution, and aerospace
The on-site power substation, set for completion in 2025, will deliver 25 MW in Phase 1 and is scalable to 50 MW in Phase 2
Additional capacity beyond 50 MW can be provided to meet future demand