This is a turn-key Data Center with modern, heavily redundant power & cooling systems.
• Lower Level: Contains the Dock, Receiving and Mechanical spaces for all 4OP
• First Floor: Contains the Building Entrance, Training and Meeting rooms
• Second Floor: Contains the Data Center
• Third Floor: Contains the Data Center
Electricity Supplier ComEd
Source Three underground supply lines, fed by two different utility grids (Only one line is required to support the Data Center)
ComEd ATO Gear on site can automatically switch between the 3 supply lines
Three 1500 KW diesel generators
• Four UPS systems
• We can operate on generator power for approximately 48 hours.
• Total Generator Power 5,625 KVA
• Total Generator Horsepower 6,500 HP
• Generator Fuel Day Tank Capacity 3,000 Gallons
• One 15,000 gal. Fuel Tank
HVAC:
Air Conditioning Four 900-ton chillers (Only one is required to support the Data Center)
Cooling Towers Four (Only one is required to support the Data Center)
Pumps Fourteen pumps totaling 320 HP and 14,650 GPM (Only two are required to support the Data Center)
1st Backup All pumps have at least one backup
2nd Backup Two 15,000-gallon chilled water storage tanks
Additional specs and drawings are available upon request.