Tri-State Industrial Park offers a new Class A industrial facility in Fairfield, Ohio, designed for modern distribution and light manufacturing needs. This 12,000 SF pre-engineered, fully insulated metal building will feature a 24-foot clear height, 6-inch reinforced concrete floors, and LED lighting throughout. The property includes two 9’ x 10’ dock doors with mechanical levelers and two 16’ x 16’ drive-in doors with motorized openers, providing flexible loading options.
Situated on a 2-acre site, the development includes a heavy-duty truck court, outdoor storage yard, and 35 striped parking spaces. The building will be equipped with 480/277V, 3-phase, 400-amp electrical service, natural gas-fired unit heaters in the warehouse, and full HVAC in the office area. Located minutes from I-75 via Union Centre Blvd and I-275 at Seward and Route 4, the site offers excellent regional connectivity for logistics and distribution. Construction is scheduled to commence in Q2 2025 with substantial completion in June 2026.