The highly anticipated Central 9th Phase 2 is underway. Located at 914 S Jefferson Street just south of Central 9 phase 1, home to some of Salt Lakes City’s finest: Laziz, Water Witch, Troubadour Saloon and Nohm. Phase 2 will be comprised of commercial space at street level and three residential units on the second floor. The property is under construction with a projected occupancy date of January 2021. Current gray shell buildout plans for the available retail space will include an underground grease interceptor, basic HVAC and 200 AMPS power to panel. 14 Ft. ceilings. Build to suit is available until March 2021, allowing the Tenant to choose the location of the bathrooms, plumbing and utility upgrades.