The brand new 260,889 SF state of the art facility situated on 10.73 acres is part of a larger development called The Park @ Live Oak, which is situated on approximately 78 acres. This property is building #2 in the development and will be 32' clear with 38 dock high loading positions, 2 ground level ramps, 155' concrete truck court, a secured yard, 22 trailer parking stalls, 120 auto car parking stalls, ESFR (K-17) Sprinklers, 52' x 50' column spacing, 52' x 60' speedbay column spacing, 3,000 SF of office and potentially 4000 Amps of power.
Construction is scheduled to commence by August 2022 with an anticipated delivery date of Q2 2023.
The property is located on the 605 Freeway with great freeway visibility. The property is located just east of the Live Oak on/off ramp on the northbound 605 freeway as well as directly south of the Arrow Highway on/off ramp on the 605 freeway heading south bound.
The property is only 3.5 miles from the 10 and 210 freeways and within 30 miles of the LA/LB ports.
Located in the heart of the San Gabriel Valley with an incredible labor pool.