This building was entirely gutted, down to block and steel, and all electrical, plumbing and HVAC removed. A new roof was installed. Concrete block and steel trusses inspected by an engineer and all recommended work was completed. Everything inside is new. HVAC, plumbing for kitchen area and 2 bathrooms and office. Floor was sanded and nonskid coating on original floor and flake floor for the rest of the flooring. 8 ft. x 16 ft. walk-in cooler. New 120, 240 and 3 phase electrical service, 2 new sewer pumps, updated plumbing and valves in the lift station that is connected to city sewer system. Parking lot partially resurfaced. Palm trees planted, signs installed. Ramp installed. Pad and hook up for ice machine, hook up for food truck.