Property Improvements:
• New closed cell spray foam everywhere but in office area (4” on ceiling, 3” on walls)
• Epoxy floor in loading area
• New Glass Block window in office
• New front door & exit door
• Installed 11 tons worth of AC
• 5 new Hot Dawg gas heaters
• New gas lines
• New electrical lines – electrical lines in main area is encased wet area rated
• New Accuity Lighting Control Pannel
• New plumbing lines
• Installed cleanout for main sewer line for building
• Installed 2 floor drains (one of which is a trench drain)
• Erected two walls to enclose main working area for a food safe environment and cool temperature working area
• Installed High Bay LED lighting
• Installed gas tankless water heater
• Security fence around outdoor package unit
• Installed exhaust fan and louvers to bring in fresh air
• Security cameras
• New gutters on both sides of building
• Updated front panel to 120-240v 200amp
• Updated main panel to 120-208v 400amp 3phase
• 2 hand washing stations (one in front of warehouse and in back of warehouse)
• 5 powered mobile racking systems from space saver (Racks that have outlets on them so they can run equipment on the racks)