Westpark Crossing Building 2 at 845 Colton Rd. presents a rare opportunity for a large-scale industrial user seeking approximately 500,320 SF of new cross-dock space in Santa Teresa, New Mexico.
Designed for high-volume distribution and logistics operations, the planned facility features 127 dock-high doors, four drive-in doors, 60-foot staging bays, 40-foot clear height, and a 185-foot truck court. The project includes 162 trailer parking spaces and 217 automobile parking spaces.
Building specifications include a 7.5-inch reinforced slab, ESFR sprinkler system, TPO roof with skylights, LED warehouse lighting with motion sensors, and 2,000A, 277/480V, 3-phase power expandable to 4,000A.
The 40-foot clear height provides an attractive option for users seeking high-density storage and modern racking configurations, while the extensive dock infrastructure is designed to support high-volume distribution and fulfillment operations.
The property is approximately 5.6 miles / 9 minutes from the Santa Teresa Port of Entry, approximately 5.0 miles / 9 minutes from Union Pacific Intermodal, approximately 2.7 miles / 6 minutes from Doña Ana County International Jetport, and approximately 9.2 miles / 15 minutes from I-10 west/east access.
With the project still in development, prospective tenants have an opportunity to engage early regarding potential tenant-specific requirements.
Contact the broker for development details, building specifications, and leasing information.