• All ceiling fixtures and finishes will be installed including grid, acoustical tile, lighting, electrical and emergency fixtures.
• All fire detection/suppression fixtures installed
• Walls will be taped, spackled and primed with no wall base or trim.
• Structural slab floor will be grinded level, acid cleaned, and delivered in a swept, clean condition, ready to accept a new finished floor covering.
• The ADA toilet room will be 100% finished and operational.