Capital Improvements completed in 2022 include: new roof and HVAC systems, patch and paint all exterior, white box interior, new interior lights, new storefront windows, new storefront double doors, new tile for two restroom floors, new ADA wall mount sinks, new toilets, new flat panel ceiling tiles, new H.M.A.C (asphalt) for all new parking lot, ADA signage and 2 ADA pedestrian ramps for the 2 front doors, updated signage.