6951 Southfront Road is a Class A industrial building in the heart of East Livermore's East Bay logistics corridor — renovated in 2023 and built to move product. The ~85,680-SF reinforced-concrete facility sits on 4.15 fenced acres directly off Southfront Road, minutes from the I-580 / Greenville Road interchange, giving trucks and staff fast freeway access in both directions across the Altamont Pass and throughout the greater Bay Area.
Inside, tenants get 30-foot clear heights, 64' × 64' column spacing, four grade-level drive-in bays, two dock-high doors with levelers, ESFR sprinklers, and heavy 1,200-amp / 277–480V three-phase power — a spec sheet that supports distribution, warehousing, light manufacturing, and flex-office users alike. Ninety-eight on-site parking spaces (1.14/1,000), central air conditioning, and a fully fenced yard round out a building ready for immediate occupancy.
Two forces set this address apart. The site now carries I-O (Industrial/Office) zoning, broadening the range of permitted uses well beyond a standard warehouse. And Valley Link's planned **Southfront Road Station** — a named stop on the new BART-to-ACE regional rail line being developed in the I-580 corridor — is slated for this very street, positioning tenants ahead of one of the Tri-Valley's most significant transit investments. Office and warehouse space can be combined within the building, making this a flexible home for companies that want room to grow in one of Livermore's most sought-after industrial pockets.