69 Green Mountain Road, under recent renovation, has been designed with top-quality building specifications, including a 32'-40' clear height, LED lighting on motion sensors, 210’ truck courts, 50’ x 56’ column spacing with 65’ speed bays, and an ESFR sprinkler system. The existing 160,236-SF of available space features 20 fully equipped dock doors in a single-side load format, 49 dedicated trailer stalls, and ±8,300-SF of main office. In addition, 69 Green Mountain Road is ±4 miles from the Exit 143 Interchange of I-81. This access provides immediate north-south US interstate flow via I-81, accessing ±191,000 workers in a 30-minute drive time. I-81 provides access to other major interstates that service the Northeast and Mid-Atlantic regions, including I-80, I-476 (Northeast Extension), I-78, and I-84.