New QEII Interchange. A 4-minute drive to the newly built $122M interchange linking 65 Avenue to Highway 2 (QE II) and the Edmonton International Airport.
Designated for Industrial Use. Aero Employment and light industrial designations are in place under the adopted Area Structure Plans.
Property Tax Advantage. The non-residential mill rate in the City of Leduc is roughly half of Edmonton’s (13.71 vs. 28.19).
Agri-Food and Cold Chain Logistics. 1.6 km from the Alberta Food Processing Development Centre, a provincial agri-food and food-processing hub.
Proven Industrial Demand. Nisku-Leduc absorbed over 275,000 sq. ft. of industrial space in Q1 2026 alone.
Power and Data Centre Potential. The site sits 800m from 240 kV high-voltage transmission lines and 2.5km from the Saunders Lake Substation.