Cherry Logistics Center presents an opportunity to acquire a Class A industrial development in one of Southern California’s most established logistics corridors. Located at 5910 Cherry Avenue in Long Beach, the property is planned for delivery in Q2 2027 and will feature approximately 304,344 square feet of modern industrial space designed to support high-volume distribution and supply chain operations.
The development offers a 40-foot clear height, 44 loading docks, one drive-in door, a 145-foot truck court, 76 trailer stalls, and 336 parking spaces. Its efficient site design and substantial power capacity of 4,000 amps position the asset to accommodate a broad range of warehouse, logistics, and fulfillment users.
The property benefits from direct access to major transportation infrastructure, including the 710, 105, and 91 freeways. It is located approximately 10 miles from the Port of Long Beach, 12 miles from the Port of Los Angeles, and 18.5 miles from Los Angeles International Airport. Long Beach Airport is approximately four miles away. The location also provides access to a population of more than 14 million people within a 50-mile radius, supporting both regional distribution and last-mile delivery operations. Cherry Logistics Center combines modern specifications with connectivity to key freight gateways, making it a compelling industrial investment within the Southern California market.