The 11.9-acre site at 5003 Dover St offers a compelling opportunity for buyers seeking a rare infill industrial or IOS development location within one of the most strategically connected corridors in the Tampa region. Positioned along U.S. Highway 41, the property benefits from prominent frontage exposed to more than 33,500 vehicles per day, providing exceptional visibility and access for logistics users, yard-intensive operations, or value-add redevelopment scenarios supported by strong market fundamentals.
Its proximity to major transportation infrastructure amplifies the site’s long-term appeal. Port Tampa Bay and Port Redwing are both within a 12-minute drive, offering streamlined access to maritime cargo and intermodal connectivity. The Selmon Expressway, I-4, I-75, and I-275 are all within minutes, enabling efficient movement throughout the Tampa metropolitan area and broader Central Florida distribution network. Tampa International Airport lies 16 minutes from the property, ensuring smooth integration of air freight operations.
Its proximity to major transportation infrastructure amplifies the site’s long-term appeal. Port Tampa Bay and Port Redwing are both within a 12-minute drive, offering streamlined access to maritime cargo and intermodal connectivity. The Selmon Expressway, I-4, I-75, and I-275 are all within minutes, enabling efficient movement throughout the Tampa metropolitan area and broader Central Florida distribution network. Tampa International Airport lies 16 minutes from the property, ensuring smooth integration of air freight operations.
With M zoning already in place and a conceptual site plan included for illustration, the property provides buyers flexibility to execute a wide range of industrial strategies while benefitting from its infill nature, established roadway network, and proximity to key commercial and residential nodes. This combination of frontage, accessibility, and regional integration positions 5003 Dover St as a standout Tampa opportunity for industrial investors seeking immediate utility and long-term growth potential.