Building 1, constructed in 2015, features 337,824 SF with 36'–40' clear heights, wide column spacing, and a two-story ±25,000 SF office. It includes 17 dock-high doors (16 with full equipment), a drive-in door, and a wire-guided racking system. Building 2, built in 1990, offers 260,800 SF with 24'–26' clear heights, 10 dock doors, and a ±2,000 SF office. Both buildings are connected by a lighted, sprinkled forklift corridor, enabling integrated operations.
The site benefits from robust infrastructure, including ESFR and wet sprinkler systems, LED lighting with motion sensors, and ample parking for 400 vehicles. Utilities are provided by the City of Bowling Green and Atmos Energy. The region’s skilled labor pool, anchored by Western Kentucky University and major employers like Corvette and Fruit of the Loom, supports advanced manufacturing and logistics operations.