CURRENTLY LEASED THROUGH FEB. 2027
Located at the nexus of Vernon and Maywood, this ±26,779 SF (0.61-acre) industrial yard offers a rare opportunity for users requiring high-capacity power and advanced electric vehicle (EV) infrastructure. The site is fully paved, secured, and immediately operational, featuring direct ingress/egress on 52nd Street with dual access points for optimized vehicle circulation.
Currently equipped with 1.6 MW (~1,923 Amps) of live power, the property includes a defined upgrade path to 5–8 MW (~6,010–9,616 Amps), making it ideal for power-intensive operations. Installed infrastructure includes 12 × 40 kW Level-3 chargers and 1 × 120 kW DC fast charger, with significant additional charging equipment on-site—comprising 19 × 40 kW and 4 × 120 kW units—ready for rapid deployment and scalability. Zoned VEM* within the City of Vernon, the property benefits from a business-friendly regulatory environment and close proximity to key regional transit routes.
This is a highly strategic asset for users focused on fleet electrification, last-mile logistics, and next-generation industrial deployment in a core Los Angeles infill location.