The building features a robust infrastructure with a central chilled water system, low-pressure steam boilers, and dedicated air handling systems that can support clean room-level conditions. Additional manufacturing support systems include process chilled and hot water, compressed air, vacuum, and specialty gas distribution, all served by a matrix of piping throughout the bays. An advanced electrical backbone provides 9MW utility feed, backup power via 500 kVA generator, redundant UPS, and Siemens-controlled building automation.
Located in Hutchinson, MN, this facility benefits from a well-established industrial base and regional connectivity to major arterials, providing efficient access for employees and freight. Zoned for manufacturing and equipped for complex processes, this sublease offers a unique plug-and-play solution for technology-driven operations seeking flexibility and scalability within an engineered production environment.