The Placer Gold Industrial Park is strategically located in South Placer County, the midway point between San Francisco, CA and Reno, NV along Interstate 80. Phase I of Placer Gold consists of ten industrial sites, the largest of which contains a recently refurbished ±365,000 SF manufacturing facility that is available for lease in divisible portions. Additionally, there are nine other sites ranging from ±3.08 - ±50.54 acres available for sale or build to suit. These parcels have been through initial site planning and can accommodate buildings from ±25,500 - ±142,000 SF, including dock loading and potential storage yards. Placer Gold is part of Placer County’s Sunset Industrial Area, with a master plan that includes a future Sacramento State University expansion campus. The project developer, Coastal Partners, can provide land and buildings on a lease or sale basis. Buildings and interiors may be modified to meet the unique needs of each user in order to maximize function and efficiency.