Marcus & Millichap is pleased to present 320 Moody Avenue, a 6-story, 553-space institutional-grade parking garage on 0.92 acres in the heart of Downtown Galveston, Texas. Completed in 2021 and built by Gilbane Building Company, the garage was purpose-built to serve the adjacent One Moody Plaza office tower, connected directly via an enclosed pedestrian skybridge engineered to provide above-grade, weather-protected access across Galveston's flood-prone downtown streets. Of the 553 total spaces, 10 are ADA-accessible and 2 are van-accessible. The property also features a professionally landscaped garden with walkways and benches along the eastern elevation, adding street-level activation along Market Street. For an investor or operator, this is a modern, well-located parking facility in a market that consistently generates demand. Galveston draws millions of visitors annually to its cruise terminals, historic Strand District, and waterfront attractions — keeping downtown parking utilization strong year-round.