300 Progress Way offers a spacious industrial facility situated in proximity to a variety of freight options and a large swath of the US population. The 100,000-square-foot facility is located within the Peak Industrial Park, with an additional 80 acres of land designated for industrial development available for expansion or additional parking. Tenants will find that all utilities are already in place and local manufacturing, warehouse, and transportation labor pools are capable of supporting current operations and any future expansion. The property, which will be available March 2022, also features a 100% tax abatement for 15 years and is located along State Route 47, two miles from US-33 and in proximity to I-75, US-68, and within a 40-minute drive of Columbus. Additionally, drivers can reach over 46% of the US population within a 10-hour drive, giving businesses a considerable advantage over competitors outside the Columbus market. 300 Progress Way is the ideal location for businesses looking for low taxes and a multi-faceted facility in proximity to a variety of transportation options. The subject features a 100% tax abatement for 15 years.