The Howard Clock Building is a 51,240 SF, four-story brick-and-beam office building constructed in 1886 and fully renovated in 2013, located 1.84 miles from Route 128/I-95, two miles from the Massachusetts Turnpike, and less than a quarter mile from Route 20.
The building offers renovated brick-and-beam and steel-joist space with exposed ceilings and good natural light, a fitness center with showers, an atrium lobby, and surface parking at 3.8/1,000 SF. Additionally, Waltham station on the Fitchburg Line commuter rail is roughly a fifteen-minute walk, and seven MBTA bus routes stop within about twelve minutes on foot — the 553, 70, 556, and 61 closest in, plus the 505 express to Federal and Franklin Streets in the Financial District, the 554, and the 558 to the Riverside Green Line D terminus. Waltham’s Main Street restaurants, coffee shops, and everyday conveniences are two blocks away.