110 Acres available to be subdivided and built-to-suit
Zoned for industrial use
NPDES permitted
Sewage line and lift station approved by Authority
Driveway permits approved by PennDOT
Substation nearby for power
Ample land for potential expansion
Proximity to major transportation routes
Access to skilled labor force
Infrastructure ready for heavy industrial operations
Favorable local tax incentives
Potential for future development and growth
High-capacity 25kV line crosses the site, with an additional 12kV 3-phase line running directly along Wynn/Collier Road
A 10” water main line is in place along Route 119 and Wynn Road.
Shovel-ready with approved sewer permitting and finalized lift station plans to the FG Joint Sewer tie-in, plus an approved tap to the Peoples Gas main on the southeast corner
High-speed fiber-optic connectivity is readily available along Route 119 and Route 857