This 30,000± SF newly constructed warehouse is purpose-built for efficient distribution and long-term performance. The facility features 28 dock-high doors, three additional dock positions on a uniform loading platform, and 10 grade-level doors - providing exceptional flexibility for a wide range of logistics and industrial operations.
Situated on a site with up to 4.0± acres of additional land available for outside storage or truck parking, the property benefits from Bay County’s flexible Industrial-2 zoning, allowing for scalable operations and future expansion. The building is designed for multi-tenant or single-user functionality, with three divisible bays, each equipped with new restrooms and infrastructure to support further buildout as needed.
Clear heights of 18’ at the eaves and 21’ at the ridge, combined with reinforced concrete slabs, support efficient racking, storage, and heavy use. The corner lot configuration provides excellent truck ingress and egress, enhancing circulation and operational flow.
Strategically located in central Bay County, the property offers immediate access to Highway 231 and Highway 98, enabling efficient regional connectivity. Estimated completion: July 2026.