Facade: Precast concrete insulated panel R-16.0, Painted, textured.
o Exterior: Painted Grey, dark grey and white per design
o Interior: Painted white
o no downspouts
Windows: Windows in Aluminum thermally insulated profile with 1-inch thick, tempered, clear glass panel in offices zones per plan
Loading doors: (186) insulated doors (9’ x 10’), manual, with viewing window.
Dock Equipment: (186 Units) Precast prefab concrete dock pits, Dock Levelers Manual 8’ ? 7’
40,000lbs with dock seals and dock light, Standard 16" lip with Factory
Installed Brush Weather seals and Bumpers. Z steel guards. AII dock
equipment already installed.
Drive-in doors: Four (4) electrically operated (14’ x 17’) with concrete ramps.
Roof: TPO 60mil roof system with R-25 insulation and white steel primed deck.
Sprinkler: Early Suppression Fast Response (ESFR) ?25.2 system in accordance with
NFPA
Slab: 8” Reinforced, 4000 psi reinforced with steel prefab mesh, on Vapor barrier,
Caulked and Sealed Joints
Truck Court: Depth min 190’ concrete (8” thick, 4 000 psi) and asphalt in zones per plan
Trailer parking: 300 trailer parking spaces
Employee parking: 523 employee parking spaces
Heating/Ventilation:
MAU/ 0.1 air change per hour. Louver and mechanical damper according
per design. Minimum freeze protection according per code
Roof drains: Internal Siphonic Roof Drain System
Lighting: 30 FC in warehouse on 15' Whips / Motion Sensors
Utilities: Water, sewer, gas, electric conduit provided. Service quantities to be agreed with provider
Electrical: Switchgear – 4 000 amp, 480/277V, 3 phase, 4-wire services
Options: 1. The building structure allows the installation of a top-running crane beam,
with a lifting capacity of up to 8 tons crane or additional equipment multiple
directions. Crane ways can be installed in any span of internal columns of PNK
Group building. an 8-ton crane is an additional option and not part of this
proposal.
2. The number of dock equipment can be increased by 32 pcs instead of
storefront structures in the center of the building. At the same time, the
parking lot markings will be adjusted to the needed type of vehicles. The
pavement is arranged for trucks.