14 MW OPERATIONAL BITCOIN MINING CAMPUS | NEBRASKA
Rare opportunity to acquire a fully operational, revenue-generating Bitcoin mining platform consisting of two commissioned facilities in south-central Nebraska. The portfolio includes the Lawrence (Webster County) and Sutton (Clay County) campuses, representing approximately 14 MW of contracted power capacity with immediate operational control upon closing.
Unlike development-stage mining projects, both facilities are fully built, energized, and actively producing revenue, eliminating construction, permitting, interconnection, and commissioning risk.
POWER ADVANTAGE
The campuses operate under long-term power agreements with South Central Public Power District, providing a blended average electricity rate of approximately $0.0372/kWh. The current agreements provide power certainty through a 10-year contracted structure, positioning the operation among the most competitive power-cost environments in North America.
Both locations feature dedicated fiber connectivity with Starlink redundancy to maximize uptime and operational resilience.
LAWRENCE CAMPUS
Located on approximately 0.46 acres adjacent to its serving substation, the Lawrence facility currently supports 8 MW of active mining load with an additional 4 MW expansion already approved.
Infrastructure includes:
• Three RK Disruptor 2000 MK II mining containers
• One Digital Shovel Mini-Pod M300
• Fully fenced and secured perimeter
• Controlled gate access
• Dedicated fiber connectivity
• Immediate substation adjacency
SUTTON CAMPUS
Located on approximately 1.18 acres adjacent to its serving substation, the Sutton facility currently operates approximately 2 MW of active mining load.
Infrastructure includes:
• Digital Shovel Mini-Pod M300
• Fully fenced and secured perimeter
• Controlled gate access
• Dedicated fiber connectivity
• Immediate substation adjacency
MINING FLEET
The portfolio includes approximately 2,490 deployed miners consisting primarily of:
• Bitmain Antminer S19 K Pro
• Bitmain Antminer S19 J Pro
• Bitmain Antminer S19 Pro
• Bitmain Antminer L7
• ElphaPex DG1+
Documented infrastructure and equipment acquisition costs exceed $3.6 million.
OPERATING PERFORMANCE
Detailed operating statements, production history, power agreements, and supporting documentation are available through the data room upon execution of a confidentiality agreement.
EXPANSION POTENTIAL
The acquisition provides a clear pathway for future growth. A potential 25 MW expansion opportunity has been identified through the Blue Hill Substation, creating a scalable platform for operators seeking to increase capacity beyond the existing footprint.
TRANSACTION STRUCTURE
Ownership is open to multiple transaction structures, including:
• Turnkey operation with mining fleet included
• Infrastructure-only acquisition
• Customized transaction structures for qualified buyers
Data room access available following NDA execution. Letter of Intent required prior to advanced due diligence.