Midwest Industrial Campus is a ±1,547,857 SF advanced manufacturing and distribution campus set on ±303 acres at 2001 N Division Street in Harvard, McHenry County, IL, on the northwest edge of the Chicago industrial market. Built in 1997 of reinforced concrete, the single-tenant campus comprises four interconnected buildings spanning three integrated environments: ±619,000 SF of manufacturing/production (conveyor system and heavy power in place), ±355,000 SF of high-bay distribution (clear heights up to ±52'), and ±573,000 SF of Class A office and administration (HQ + R&D, fully air conditioned, with conference and training facilities and a day-lit atrium).
The property offers ±53 exterior dock doors, ±7,000 parking spaces (±4.52 per 1,000 SF) including covered and underground parking, and over 1 million SF of pavement suited to trailer storage, container yards, and laydown. A secured single point of access serves the campus, and 260+ acres remain open for expansion, build-to-suit, or outdoor storage at a low ±0.12 FAR.
Campus amenities include a ±1,100-person cafeteria and servery, a ±500-seat auditorium, on-site daycare, a fitness center, walking and biking trails, and an on-site helipad. The asset is direct on US Route 14 (±10,800 vehicles/day) with highway reach to I-90 and the broader Chicago, Rockford, and southern Wisconsin markets, and sits ±2 miles from the Harvard Metra station (UP-Northwest line). FEMA Flood Zone B/X. Stabilized, institutionally maintained, and ready for occupancy. Available as a full ±1.55M SF campus or divisible by building. Pricing and detailed specifications available upon request.