Frontage and Signage on the high traffic East US Highway 40. Never have to worry about finding a parking space because there are parking lots both in the front and rear of building. Building is divided into 5 separate units. 4 units on ground level with frontage. One unit, a counseling center, has only one entrance in the rear and is located on the Lower Level. Lower Level walks-out onto the rear parking. Building has 107 feet of frontage on US Highway 40.