COLD STORAGE & PROCESSING READY
This 28,000± SF facility built in 2011 offers purpose-built infrastructure for cold chain logistics, food processing and storage. Featuring multiple temperature zones and the ability to handle a variety of products, the facility includes:
• 20’ x 30’ of freezer storage (-10°F)
• 11,000± SF of cooler space (32–45°F)
• 9,000± SF for ambient dry storage or staging
• Processing floor suitable for light food production or prep
LOGISTICS & ACCESS
Strategically located with direct access to major regional arteries, including located directly off US HWY 301, this property features:
• 9 total dock-high doors – 8 standard (2 of which are covered)
• 1 roll-up door with ramp
• Oversized truck court for maneuvering or trailer storage
• Fenced and secure lot with gated access
• On-site trailer or box truck parking
UTILITY & INFRASTRUCTURE HIGHLIGHTS
• Ceiling height: 18’8” at the eves and 22’6” at the peak
• Refrigeration: 16 3-phase power cooling units to deliver appropriate temp
• Water: Private system | Well/Sewer: Private gravity-fed system
SUPPORT & ADMIN SPACE
• 4,700± of dedicated built-out office space
• Suitable for: Locker rooms, break rooms, conference area, admin space and 2 (existing) bathrooms
• Wi-Fi/cable and high-speed data connectivity available
IDEAL USERS
• Cold chain logistics providers
• Grocery and meal kit distributors
• Food processors and commissary kitchens
• Regional 3PLs or last-mile delivery hubs
• Specialty produce, seafood or meat handling firms