304-935-5996
16498 Graham Station Road, Letart, WV for Sale
Industrial LAND - FOR SALE
1/13
8,058,600 SF

16498 Graham Station Road
Letart, WV 25253


HIGHLIGHTS

  • Exceptional on-site power stack: 12.47kV, 69kV, 765kV on-site; 345kV at 700 ft; direct access to AEP Sporn Substation less than 6 miles away.
  • 185± acres with no zoning, no restrictive covenants, fee simple title with mineral rights, maximum development flexibility.
  • Located in Mason County’s industrial surge, near NScale 8GW AI campus, Nucor $4B steel mill, Frontieras $850M plant.
  • Nearly level topography, low site prep costs, soils support engineered on-site septic systems.
  • 1,500 ft of WV Route 62 frontage, two access points, 15 mi to I-77 (Exit 138), 15 mi to US-35, 10 mi to Jackson County Airport.
  • Clean due diligence package, Phase I ESA (clear), wetlands delineated, boundary survey and ALTA in progress, clear title.

OVERVIEW

LETART COMMERCE PARK | 185± ACRES | LETART, MASON COUNTY, WEST VIRGINIA Industrial & Commercial Development Site | Fee Simple with Mineral Rights | For Sale or Ground Lease RARE OPPORTUNITY IN THE HOTTEST INDUSTRIAL CORRIDOR IN THE EASTERN U.S. Letart Commerce Park is a 185±-acre, industrial and commercial development site positioned at the epicenter of one of the most dynamic economic buildouts in America. This is some of the last level ground remaining in the area that is outside the floodplain. Mason County, West Virginia is experiencing a once-in-a-generation industrial surge with over $5 billion in announced private investment, including the Nucor $4 billion steel mill, the Frontieras North America $850 million advanced coal reformation plant, and the Monarch Compute Campus, the 8GW AI data center campus being developed by NScale and American Intelligence & Power, one of the largest proposed AI data center developments in the United States. Letart Commerce Park sits directly within this corridor, just 12 miles from I-77 and approximately 10 miles from Jackson County Airport along WV Route 62, placing it in immediate proximity to the region’s most significant industrial demand generators. This is a strategically positioned, infrastructure-rich, development-ready site with the utility capacity to support heavy manufacturing, advanced industrial, logistics, data center, and energy-intensive users. EXCEPTIONAL POWER INFRASTRUCTURE; THE DEFINING ASSET In today’s power-constrained development environment, land is no longer scarce; power is. Letart Commerce Park offers an extraordinary on-site power stack that is incredibly unique on a greenfield industrial site: • 12.47kV distribution line — On-Site • 69kV transmission line — On-Site • 765kV high-voltage transmission line — On-Site • 345kV transmission line — 700 feet from the site boundary • AEP Mountaineer 1.3 GW Power Plant – 6 miles from site • Direct connectivity to AEP’s Sporn Substation —6 miles from site All lines are served by Appalachian Power Company (AEP), a subsidiary of American Electric Power, one of the largest electric utilities in the United States. The presence of 765kV and 345kV infrastructure at this scale, on a single undeveloped industrial parcel, is an asset that typically takes years and tens of millions of dollars to position. It exists here today. For manufacturers, data center developers, battery energy storage operators, or any power-intensive industrial user, this site eliminates the most critical infrastructure bottleneck in the site selection process. --- WATER INFRASTRUCTURE • On-site 10–12” municipal water main served by Mason County PSD • Static pressure: 150+ PSI High-pressure public water at this volume supports industrial process water demands, fire suppression, cooling systems, and workforce facilities. --- FIBER CONNECTIVITY • Multi-gigabit fiber available on-site, provided by Frontier Communications • Supports data-intensive operations, remote monitoring, and enterprise connectivity requirements from day one --- SITE CHARACTERISTICS • 185± acres — subdividable to accommodate users • No zoning restrictions — maximum development flexibility, no use limitations • Nearly level topography — low site prep costs, immediate grading readiness • Located outside the FEMA 100-year floodplain (existing pond area excepted) • 1,500 linear feet of frontage on WV Route 62 — excellent visibility and multi-point access • CSX Class I Railroad approximately 75 feet east of the property line — proximate rail access for future tenants or buyers requiring freight rail service • Ohio River approximately 500 feet east of the property — proximity to one of the most important commercial waterways in the United States, with long-term potential for logistics users seeking river access --- COMPLETED DUE DILIGENCE; SELLER HAS DONE THE WORK Sellers have invested significantly in pre-development due diligence, dramatically reducing buyer timeline risk and transaction costs: • Phase I Environmental Site Assessment — Clear; no recognized environmental conditions • Wetlands and streams delineated with Nationwide ACOE permit underway • Phase I Archaeological Onsite Survey — Complete • Boundary Survey — In progress • ALTA Survey — In progress • Clear fee simple title with mineral rights included or negotiable This level of pre-completed due diligence on an 185-acre industrial site is exceptional, and the seller is committed to a clean transaction. A qualified buyer can move from LOI to closing on an accelerated timeline. --- REGIONAL ECONOMIC MOMENTUM — BUYER CONTEXT Mason County is not a speculative growth market. It is actively under construction. The Nucor steel mill, a $4 billion investment and one of the largest private capital deployments in West Virginia history, is creating 800 permanent jobs and thousands of construction positions. Frontieras North America broke ground in April 2026 on an $850 million advanced coal-to-products facility that will employ 200+ full-time workers and thousands during construction. The Monarch Compute Campus, a proposed 8GW AI data center site operated by NScale and AIP, is one of the largest AI data center development projects in the United States and is located in Mason County. West Virginia’s HB 2014 creates certified private power microgrid districts for data center campuses of 90MW or greater, making the state one of the most favorable regulatory environments in the country for power-intensive industrial development. Mason County sits within a one-day drive of 50% of the U.S. population, with I-77 12 miles away and Jackson County airport 10 miles away. This is a market where industrial land with infrastructure sells, and this site has infrastructure most markets cannot offer. --- DEAL STRUCTURE • For Sale: Fee simple interest in 185± acres, mineral rights included or negotiable • Ground Lease: Seller will consider long-term NNN ground lease with creditworthy tenant • Subdivision: Seller is willing to subdivide for the right buyer • Pricing: Contact seller for guidance; NDA or initial discussion welcomed • Seller is an experienced developer and is committed to closing --- CONTACT Scott Buckley | President, Jesco Corporation 304.935.5996 | Scott@jescocorp.com | jescocorp.com Qualified principals and brokers welcomed. Co-broker cooperation available. --- The information provided herein is from sources deemed reliable but not guaranteed. All interested parties are encouraged to conduct independent due diligence.

FOR SALE DETAILS

PRICE

Request Info for Price

# OF LOTS

-

LAND DETAILS

PROPERTY TYPE

Land

PROPERTY SUBTYPE

Industrial

LAND PROPOSED USE

Commercial, Industrial, Retail, Office, Mixed Use, Multi-Family, Hospitality, Airplane Hangar, Airport, Apartment Units, Apartment Units - Condo, Apartment Units - Senior, Auto Dealership, Auto Repair, Auto Salvage Facility, Bank, Bar, Baseball Field, Car Wash, Cement/Gravel Plant, Cemetery/Mausoleum, Chemical/Oil Refinery, Community Center, Contractor Storage Yard, Correctional Facility, Distribution, Food Processing, Garden Center, General Freestanding, Golf Course/Driving Range, Health Care, Hold for Development, Hold for Investment, Horse Stables, Hospital, Hotel, Industrial Live/Work Unit, Industrial Park, Lumberyard, Manufactured Homes/Mobile Home Park, Master Planned Community, Medical, Motel, Neighborhood Center, Office Park, Open Space, Outlet Center, Parking Lot, Planned Unit Development, Police/Fire Station, Power Center, Public Library, Public Park, R&D, Recycling Center, Refrigeration/Cold Storage, Regional Mall, Religious Facility, Restaurant, Retail Warehouse, Schools, Self-Storage, Service Station, Single Family Development, Skating Rink, Specialty/Festival/Entertainment, Storefront Retail/Office, Strip Center, Supermarket, Trailer/Camper Park, Truck Stop, Truck Terminal, Utility Sub-Station, Warehouse, Water Treatment Facility, Winery/Vineyard, Agricultural, Agribusiness, Pasture/Ranch, Timberland, Single Family Residence, undefined

LAND ACRES

185 AC

LAND SF

8,058,600 SF

OFFSITE IMPROVEMENTS

Water, Electricity, Streets, Cable, Telephone

ZONING

None

APN/PARCEL ID

26-04-0247-0091,26-04-0247-0092,26-04-0247-0099

ASK ABOUT THIS PROPERTY

Scott BuckleyJesco CorporationMore Info
304-935-5996

By clicking the button, you agree to Showcase's Terms of Use and Privacy Notice.

Scott BuckleyJesco CorporationMore Info
304-935-5996

By clicking the button, you agree to Showcase's Terms of Use and Privacy Notice.