The single scarcest asset in American industrial real estate is power-ready land. Power-ready industrial land is not a commodity — it is the constraint that determines where the next decade of manufacturing and tech infrastructure gets built.
This site has it. A Consumers Energy 138kV substation sits directly adjacent to the parcel boundary on W. Beecher Rd. — 9 MW available day one, no interconnection application, no multi-year queue. In a national market where securing new utility service averages 3–5 years, this site eliminates the single biggest constraint facing advanced manufacturing, data center, and logistics development today.
Located at 1610 & 1900 W. Beecher Rd. in Adrian, Michigan, this 157-acre I-1 industrial site is Southeast Michigan's premier power-ready development opportunity. Every major pre-acquisition study is complete: Phase I environmental (clean, 17 soil samples), ALTA/boundary survey, topographical survey, wetland delineation (none identified), and FEMA Zone X flood confirmation. An LOI can move to closing without delay.
Infrastructure at the street: 12" water main · 10" sanitary sewer · 4" 60 PSIG natural gas (up to 200M BTU/hr) · carrier-class redundant fiber (10ms Detroit / 20ms Chicago) · I-1 industrial zoning with fast-track permitting.
Logistics position: 60 minutes from 2.5 million people · Toledo 38 mi · Ann Arbor 36 mi · Detroit Metro Airport 52 mi · FedEx and UPS distribution hubs under 1 hour · 1-day ground shipping to 50%+ of U.S. and Canadian consumers.
Ideal for: advanced manufacturing, data center/colocation, warehousing & logistics, e-commerce fulfillment. Site tours available immediately. For inquiries, please contact: jayb@objectiv.com