This property is ready for construction. The time from engineering plans until shovel hits the dirt will be greatly reduced, plus you will save millions with the existing infrastructure and partial building already in place.
Danimer began to build a large chemical plant in 2022, including the large partial building seen in the pictures. The decision was made to stop construction and to look to sell the assets. Danimer spent almost $25,000,000 on the partial building - $4,600,000 for excavation and foundation work, $12,800,000 for steel and fabrication, $5,000,000 on steel erection, and $2,100,000 on roof system.
In addition, this 100-acre site has already been cleared and is in a brand-new industrial park with all utilities and roads in place. Water is plentiful and reasonably priced with wastewater capacity to handle most any industrial facility needs.