• ±1,000 SF silo-control and truck dispatch office
• ±4,000 SF truck maintenance facility
• ±4 acres stabilized caliche truck parking with
diesel fueling station
• Man Camp: Twenty (20) person capacity
• Fully operable Loop-Track: 8,233.98’ of Total Clear Footage on Closed
Loop; 9,741.66’ Total Clear Footage on Wye
• Loop track provides both entry and exit points with all switch and
safety gear in-place
• I-35 direct access and strategically located:
85 miles from Port Laredo International Rail Bridge providing
connectivity throughout Mexico
San Antonio – 85 miles
Houston – 268 miles
Dallas /Fort Worth – 350 miles
Fully functional distribution terminal with the following equipment in-place:
• Four (4) fully automated silos: 20,000 ton capacity
• One double-sided safe-track
• Fully motorized rail-pit for unloading
• Redundant in-bound/out-bound legs (conveyors and elevators) at
the storage silos
• Four (4) Electronic truck-load scales positioned at each silo
• Heavy power in-place with two (2) separate electric providers (AEP
and Medina Electric)
• Municipal grade water well and septic
• City water and sewer located directly across Business 35 from site