Building C at Callender Commercial Park offers a specialized industrial environment suited for operators seeking a facility with existing infrastructure for controlled-environment processes. Positioned within the Arroyo Grande industrial corridor, the building’s location provides access from both Highway 1 and Callender Road, connecting directly to the broader Central Coast region and nearby Highway 101. This placement supports logistical needs for businesses that move materials or maintain regional distribution activity.
The structure is a reinforced concrete industrial building with interior features that differentiate it from conventional warehouse facilities. Temperature-controlled rooms, supported by dedicated air-conditioning equipment, can accommodate operations requiring stable environmental conditions. The building has previously held FDA-related approval, indicating its suitability for regulated uses such as specialized manufacturing, processing, or clean-environment activities, subject to updated compliance requirements.
The utility layout includes 400-amp, 3-phase power, offering capacity for machinery, climate systems, or production equipment. Six roll-up doors support efficient movement of goods and materials throughout the space. Two ADA-compliant restrooms and office components provide functional support areas for day-to-day operations.
The exterior setting includes perimeter fencing equipped with an automatic entrance gate, creating a defined and secure operational boundary. Adjacent parking areas accommodate staff or service vehicles. As part of a larger multi-parcel industrial park, Building C sits within an area zoned for full industrial use, allowing a broad range of permitted activities and potential future integration with nearby parcels if expansion becomes desirable.
Building C represents an existing, infrastructure-ready industrial option for users who require environmental controls, utility capacity, and direct regional access within the Central Coast industrial landscape.