Zoned Industrial
Shovel-ready with flat topography, no floodplain or wetlands
Phase I & II ESA, geotechnical study, and wetlands delineation completed (all
clean)
On-site utilities: electric (7,200V, 3-phase), fiber up to 10 GB, solar system
available
Nearby utilities: water (1.2M GPD excess), sewer (281,000 GPD excess), gas
line within 200 ft
Adjacent rail access (Patriot Rail, Class II), spur possible
Situated close to US 127 (1 mi) and US 24 (7 mi)
Regional connectivity: Fort Wayne International Airport (40 mi), Toledo Port
(87 mi)
Enterprise Zone designation and local incentives available
Established industrial presence nearby (steel, plastics, seating), employers
include Holcim and Systech
Designed for advanced manufacturing logistics and distribution
Skilled industrial labor pool supported by local trade schools and colleges