NEWLY REMODELED
INFILL INDUSTRIAL GREAT PARKING
This building delivers reliable, future-ready power with a 200A Siemens main breaker panel supporting 120/240V single-phase or 120/208V three-phase loads, multiple pre-wired 240V high-power outlets (including NEMA 6-50, L14-30, and 14-50 receptacles) fed by individual fused disconnects for welders, EV chargers, or heavy equipment, an Eaton automatic transfer switch labeled “Bottom Side LTNE” for seamless generator backup, and a flexible Busway track system enabling plug-and-play power distribution anywhere along the production floor. All installations use armored cable, metal boxes, and code-compliant conduit routing—delivering unmatched plug-and-play flexibility, reduced build-out costs, and business continuity.
To put crane into production, a spend of $15,000-$20,000 is estimated.