GIGAWATT SCALE DATA CENTER & ENERGY CAMPUS
1,280 Acres | Light Industrial/Data Center.
526 Acres (+/- 278 acres usable) | Hard Industrial.
4,636 Acres | AMR (Solar Developable).
Topography | Level / Gentle Slope.
WATER RIGHTS
Up to 4,500 AFA - 1.47 Billion gallons per year of industrial water are available for development and power generation.
The 4,500 AFA of industrial water rights are permitted to optionally be pumped from one central well location that has already been installed, tested and developed.
Permits are approved and issued.
Renewable Power and Generation
Gigawatt Scale Natural Gas Available.
NV Energy 1 GW Engineering Study is Process.
Transmission Ramp Start Request Q4 2028.